Brian & Debbie Shaw
Date Posted
Summary
8/13/08
Roof framing well under way.
7/25/08
Upper Level floor system in place. Framing begun.
7/23/08
More framing. 2nd floor system about to be installed.
7/4/08
Main Level floor system in, and framing under way.
6/12/08
Slab being poured and finished.
4/19/08
Under-slab plumbing is in. Septic field is installed. Ready to pour slab.
4/4/08
Poured walls and footers for deck posts in. Ready for under-slab rough plumbing.
3/23/08
Wall forms mostly in place.
3/12/08
Footers being poured.
Go to pre-construction photos.
Shaw Project
Construction Photos
Home Page
2008
Jan |
Feb
|
Mar
|
Apr
May |
Jun
|
Jul
|
Aug
Sep | Oct | Nov | Dec
Go to Pre-Construction Photos